Square pool lit at night, pale blue mosaic, water blade on a slate-clad wall and warm lanterns, built by ORIGEN, Costa Blanca

ORIGEN · Costa Blanca

Pools, terraces and renovations in Orihuela Costa

About 15 minutes from our base in Los Balcones.

What we usually build here

Orihuela Costa is sixteen kilometres of low, mostly flat coast, and nearly all of it is urbanisations. Along the front in old Cabo Roig and Dehesa de Campoamor the villas sit on big plots, from a few hundred square metres to well over a thousand, and that is where ORIGEN builds 9 by 4 and 10 by 5 metre pools with an overflow edge, an outdoor shower off the terrace and a garden planted with the summer wind in mind. Around the Villamartín golf course it is detached two-storey villas from the seventies onwards, and the usual job is a 7 or 8 by 4 pool, a new non-slip porcelain terrace and a fresh bathroom or kitchen inside. Further inland, in La Regia, Los Dolses and the back streets of La Zenia and Playa Flamenca, the stock is townhouses, quads and bungalows with a private garden of a hundred and something square metres, so a 6 by 3 pool with a raised deck and artificial grass is what fits. In Punta Prima the original single-storey villas usually want a full renovation first and the pool second.

Getting it licensed in Orihuela Costa

Orihuela Costa has no town hall of its own: the licence comes from the Ayuntamiento de Orihuela. The coastal office is at Plaza del Oriol in Playa Flamenca; the main council sits in Orihuela city, about thirty kilometres inland, and the file moves between the two. ORIGEN draws the project, prepares every document and files it, and you get copies of everything submitted. The council sets the pace, not us, and we start digging only once the licence is granted. If your plot falls inside the Sierra Escalona and Dehesa de Campoamor protected landscape, a prior report from the regional Conselleria may be needed; ORIGEN checks that at the visit.

Ground, wind and access in Orihuela Costa

The ground is much the same here: a hard caliche crust on top, red clay and silt under it, soft sandstone below, and groundwater far down, so the hole stays dry and only the crust slows us. It is flat in La Zenia, Cabo Roig and Playa Flamenca and slopes in Lomas de Campoamor and Punta Prima, where we step the pool into the hill. The summer Levante blows from the north-east and the cliff air is salty, so we fit marine stainless steel, salt-resistant fixings and light porcelain that stays cool facing south. In tight quad and bungalow streets we walk the excavator route before quoting, and if it cannot pass we lift a fence panel and refit it.

Villamartín, Los Dolses, Playa Flamenca, Punta Prima, Cabo Roig, La Zenia

Everything outside — and inside — your home

Pick one job, or hand us the whole garden.

Concrete pools

Concrete pools

Reinforced shells, glass mosaic, lighting, waterfalls and covers. Built to last decades, not seasons.

Terraces & decking

Terraces & decking

Porcelain, travertine and composite. Cool underfoot, non-slip, laid to drain properly.

Gardens & irrigation

Gardens & irrigation

Planting, turf, gravel, lighting and irrigation that survives a Spanish August.

Home renovations

Home renovations

Kitchens, bathrooms and full interiors. The same crew that builds outside finishes inside.

Bathrooms & marble

Bathrooms & marble

Large-format marble, hidden lighting, walk-in showers. Waterproofed the right way.

The whole garden

The whole garden

Pool, terrace, planting, fencing and lighting drawn together and built in one go. One crew, one price, one summer.

Tell us the shape of it in 30 seconds

Pick what you have in mind. We put it into a message, you press send, we come back with a written price.

What do you want built?
Roughly what size?
Anything else with it?
Where is the plot?
Square pool at night with a blue LED water blade on a slate feature wall, pale blue mosaic and warm wall lights

Built to last decades, not seasons

Reinforced concrete shell, glass mosaic, proper filtration and lighting. The same crew from the first cut to the first swim.

Send a photo on WhatsApp

How it works

Four steps, one point of contact, no surprises.

1

Free site visit

We come out, measure, listen — and you get a clear written quote.

2

Design & licence

We draw the project and file every document. You never deal with the town hall.

3

We build

Excavation, steel, concrete, mosaic, terrace and planting — our own crew, start to finish.

4

Handover

Filtration and lighting tested, everything explained, and the same number to call after.

Who you are dealing with

A registered Spanish business, not a phone number and a van.

Registered business

Sole trader registered in Spain. NIF and invoices on every job, IVA shown separately.

Our own crew

Excavation, steel, concrete, mosaic, terrace and planting are done by the same team. No chain of subcontractors.

Licence filed by us

We prepare the project and file every document at the town hall. You never queue there.

Free visit and estimate

The first visit and the itemised estimate cost nothing. The price is written down before anything is dug.

Realistic timing

From about a week for small work to about a month for a full pool, weather and licence permitting.

Four languages

We answer in English, Spanish, Russian and Ukrainian, the same person from first message to handover.

Oleksandr Mazalo · NIF X7539252-J · Calle Aitana 8, Los Balcones, 03186 Torrevieja, Alicante · +34 608 35 69 38 · +34 629 96 68 87 · info@origenconstruction.com · Instagram · Facebook

What our clients say

Reviews left by clients in Torrevieja and around.

Very happy with the result of our project. They met every deadline and there were no extra costs. The quality of the work and the way they treat you have been great from the first moment. I recommend them.
Ana GarcíaClient · Torrevieja
I hired this company to renovate my flat and they did a great job, following my instructions and finishing in the time we agreed. I recommend them.
Ángel FuentesClient · Torrevieja
We recently remodelled our pool with them — a very professional team. They work with the best materials on the market and you can tell: the pool turned out beautifully. 100% recommended.
Cristina SorianoClient · Torrevieja

Questions we get every week

How long does a pool take?

From about a week for small work up to roughly a month for a full concrete pool, once the licence is in. Weather and the town hall set the pace more than we do.

Do you handle the licence?

Yes. We prepare the project and file every document at the town hall ourselves. You do not go there.

Is the first visit really free?

Yes, and so is the itemised estimate. We come out, measure, and you get the price in writing before anything is dug.

How far do you travel?

About 150 km around Torrevieja. Most weeks we are in Orihuela Costa, Guardamar, Rojales, San Miguel, Pilar de la Horadada and Murcia.

Do you only do pools?

No. Terraces, gardens, irrigation, fencing, bathrooms and full home renovations, with the same crew.

What languages do you work in?

English, Spanish, Russian and Ukrainian, and it is the same person from the first message to the handover.

Show us your garden

Send one photo on WhatsApp. You get an idea of what fits and roughly what it takes, usually the same day.